14 August 2026
1
To: Graham White, East Bergholt Parish Council
From: Marina Ericson, Chair, East Bergholt Tennis Club
Subject: East Bergholt Tennis Club – court repair and resurfacing courts 2& 3
The Tennis Courts in East Bergholt are owned and maintained by the Parish Council who
delegate day to day management of the facilities to the Tennis Club. This paper is written to
clarify and obtain agreement to the decisions required by the Tennis Club from the Parish
Council, in consideration of tennis court repair requirements.
1. Requirements in 2026/7
a) Court 3 at the tennis club requires urgent maintenance to ensure a competition level
court surface through investigation and removal of bumps which have developed over
several years. The bumps have now become so significant they pose a potential health
and safety risk and trip hazard to players.
b) The aging fencing around the courts requires maintenance to infill gaps at the bottom
allowing balls to run off into the ditch, some replacement on the side run and some
additional tightening of the fencing itself.
c) Ongoing, annual court maintenance needs to be put in place with project costings to be
met through the establishment of a sinking fund.
d) Consideration for resurfacing of courts 2 and 3 which will be required within the next 1-3
years.
2. Scope of Work – Options
1) Solely investigate and repair the bumps on court 3.
2) Investigate and repair the bumps on court 3 and resurface court 3.
3) Investigate and repair the bumps on court 3 and resurface courts 2 & 3 at the same
time.
4) Repair fencing, if agreed, in addition to option 3 above.
5) Annual court maintenance
3. Tennis Club Preferred Option
Funds have now been put in place to achieve option 3 above. Both the Sports Council and
Playing Fields Committee support option 3, which is the preferred option for the tennis club.
Rationale:
• Both courts are anticipated to require resurfacing within the next 1 – 3 years. They have
already outlived the number of years expected from asphalt.
• Resurfacing both courts at the same time will save the Parish Council money over the
long term.
14 August 2026
2
• Resurfacing both courts at the same time will minimise disruption to both tennis club
members and the other clubs using the playing pitches due to access required. Works
are expected to take a minimum of 4 weeks, throughout which play will have to be
suspended. Therefore, going through this only once rather than on separate occasions in
short succession is preferrable.
• Aesthetically patching the bumps following repair would look untidy and unprofessional.
• If only court 3 were to be resurfaced, there would be a small height differential between
courts 2 and 3 which may be a potential health and safety hazard.
4. Previous quotes for work required
In early 2026 the Tennis Club invited two quotes for the repair and resurfacing of courts 2 & 3
from Suffolk Tennis Courts and ETC Sports Surfaces. ETC was considerably cheaper. It is a
SAPCA (Sports & Play Construction Association) member and comes with testimonies from
other customers. ETC also quoted for repairs to the fencing, albeit it is the understanding of the
Tennis Club that this sits outside of the £20,000 fund set aside by the Parish Council for repair to
court surfaces.
The below table is a cost summary of options (quoted in 2026):
Repairs only
court 3
Repair & resurface
court 3 only
Repair court 3 &
resurface courts 2 & 3
Fencing repairs (side
runs and edgings)
£1,913 – £7,686
+ VAT
£16,290 – £22,063 +
VAT
£27,395 – £33,168 + VAT £6,136 + VAT
SAPCA registration is recognised as an effective standard when choosing a supplier.
5. Anticipated constraints for works
In order for the tennis courts to be resurfaced, large tarmac lorries and skips will require access.
Currently the only existing access is across the Gandish Road Playing Fields. This will cause
disruption to other users and clubs (in the main football and cricket) and it is highly likely that
such heavy vehicles would cause damage to the field area which will require reinstatement and
may again cause disruption to users and clubs.
Through discussions with Michael Hockley (July 2026), verbal agreement has now been given for
such vehicles to drive around the edge of the playing field without tracking, providing it is during
a dry period, thus reducing/eliminating the requirement for reinstatement works. Proposed
timing for the works is therefore July & August 2027.
6. Confirmed funding to achieve option 3 scope of work
Part 1 – Parish Council
As a result of a paper submitted by the Tennis Club to the Sports Council in November 2025, the
Parish Council included £20,000 in the 2026/2027 budget for repair to the bumps on court 3. It
has been confirmed verbally that this money will be available should the project run into the
2027/8 financial year
14 August 2026
3
Part 2 – Sport England
Earlier this year, the tennis club made an application to Sport England for match funding against
monies raised through a crowdfunding platform called Crowdfunder. Sport England have now
awarded an amount of £9,000 as a grant i.e. it is not conditional upon other fundraising.
However, a condition of the grant is that all work must be complete by 31 August 2027.
Part 3 – East Bergholt Tennis Club
To contribute any additional monies which may be required over and above the £29,000 from
the Parish Council + Sport England grant for the resurfacing of courts 2 and 3. This recognises
the contribution of the Parish Council, for this project, is capped at £20,000. Anticipated
additional monies expected to be approximately £7,000 (based on 2026 prices so this may
increase) although this could increase.
7. Agreements/decisions required from Parish Council, Playing Fields Committee and
Sports Council
1) All stakeholders will be managed, and works delegated, through Graham on behalf of
the Parish Council. Stakeholders include the Playing Fields Committee, Tennis Club,
Sports Council and Contractor.
2) Confirm scope of work to include repair to bumps on court 3 and resurfacing of courts 2
& 3 at the same time.
3) Confirm funding achieved through £20k from Parish Council, £9k from Sport England
and the remaining monies from the Tennis Club (expected to be approximately £7k).
4) Agree to the works being completed no later than 31 August 2027 to enable the Sport
England grant which means works to take place in July and August 2027.
5) The Tennis Club will submit a Performance Specification to the Parish Council + three
suggested companies to invite to quote for agreement and approval.
6) Parish Council to request 3 quotes, based on the agreed Performance Specification, at
the end of October 2026 (after the Playing Fields Committee meeting 22/10).
7) A supplier to be selected and accepted by the Parish Council and Playing Fields
Committee, in consultation with the tennis club, by end of January 2027 and appointed
in February 2027 for work to commence in July 2027.
8) The Tennis Club to manage the delivery of the work with oversight from the Parish
Council and Playing Fields Committee.
9) Tennis Club to transfer the Sport England grant and any additional monies to the Parish
Council ahead of Parish Council paying the final invoice. Tennis Club will require a copy
of the final invoice to provide evidence of the completion of the work to Sport England.
14 August 2026
4
APPENDIX 1 – Suggested companies (in order of preference) to invite to quote
COMPANY CONTACT DETAILS HOW THEY ARE
KNOWN TO US
SAPCA
REGISTERED
1 ETC Sports
Surfaces LTD
Chris Headon
01621 858686
info@etcsports.co.uk
Through previous
experience of
head coach and
provided
competitive
quote in April
2026
Yes
2 Toppesfield 01473 829129
estimating@toppesfield.com
toppesfield.co.uk
Suggested by
John Hambrook
No – they state
that they
adhere to
generic
industry
specifications
3 Suffolk Tennis
Courts
Kris Thorpe
01473 730806
07725 974515
suffolktenniscourts.co.uk
Through previous
experience of
head coach.
Were expensive
compared to ETC
on last quote
from them in
October 2025
Yes
3 OR
Cambridge Courts
cambridgecourts.co.uk
Not known to
Tennis Club –
internet search,
fairly local, deal
exclusively with
outdoor tennis
courts
Yes